Next DC Data Centre

Rigsafe delivered specialist lifting, rigging and façade installation services for a major data centre in East Perth, safely installing prefabricated façade modules and façade systems using heavy lifting cranes and high-reach access equipment within a constrained urban construction environment.

Project Requirements and Site Conditions

The East Perth Data Centre required the installation of large prefabricated façade modules and external façade systems as part of the construction of a high-performance critical infrastructure facility.

The project demanded careful planning due to the size and weight of the façade components, restricted site access and the need to coordinate lifting activities alongside multiple construction trades. Working within a confined metropolitan site required precise crane positioning, detailed lift planning and specialist access equipment to safely complete each installation.

The combination of heavy structural lifts and high-level façade installation required an integrated lifting methodology to ensure safety, accuracy and programme certainty throughout the project.

How Rigsafe Delivered the Work

Rigsafe provided an end-to-end lifting solution, combining detailed lift planning, heavy crane operations, specialist rigging and high-reach access equipment to safely install the building façade.

A 130-tonne mobile crane was utilised to lift and position the prefabricated façade modules, while 180-foot boom lifts provided safe access for installation crews working at height. Every lift was carefully sequenced to coordinate with surrounding construction activities and ensure each module was accurately aligned before final fixing.

Working closely with the principal contractor, our experienced team safely managed the installation process from mobilisation through to final façade completion, maintaining productivity while meeting the exacting standards required for a critical infrastructure project.

Rigsafe's scope included:

  • Lift planning and engineered lifting methodology
  • Crane hire using a 130-tonne mobile crane
  • Specialist rigging services
  • Installation of prefabricated façade modules
  • External façade installation
  • Operation of 180-foot boom lifts
  • High-level access and installation support
  • Coordination with the principal contractor and site trades

The Result on Site

Rigsafe successfully completed the façade installation, supporting the construction of a major data centre through safe, efficient and precisely coordinated lifting operations.

By combining heavy lifting capability with specialist access equipment and experienced installation crews, the project was delivered in accordance with programme requirements while maintaining the high standards expected on critical infrastructure developments.

The project demonstrates Rigsafe's growing capability within the rapidly expanding data centre sector, providing integrated lifting, rigging and façade installation solutions for technically demanding, high-value construction projects.

Project highlights:

  • Installation of prefabricated façade modules
  • Specialist external façade installation
  • 130-tonne mobile crane operations
  • 180-foot boom lift access
  • Precision lifting in a constrained metropolitan environment
  • Integrated crane hire, rigging and installation services
  • Safe delivery supporting critical infrastructure construction